Property Owner Delivery
Prep Checklist
Everything you need completed before your MirroPod™ or Haven Pod™ arrives.

✓ SITE PREPARATION
1. Choose the Pod Placement Location
✔ Clear, level ground or level set pier/pilings
✔ Accessible for truck + trailer delivery
✔ Minimum 25 ft of open space (depending on pod model)
✔ No low tree branches, fences, or structures blocking path
​
Pro Tip: Walk the delivery route from the road to the pad — if a truck can’t make that turn, the pod won’t either.
✓ POD PREPARATION
2. Prepare Padsite (Required)
✔ Pier System
-
Concrete piers spaced per load specs
-
Must be 100% level and stable
We will provide exact pod footprint and load specs.


✓ UTILITIES PREP
3. Electrical Requirements (Mandatory)
✔ 50-amp service panel OR dedicated circuit (100-amp if adding amenities)
✔ Conduit run to the pad location
✔ Outdoor-rated breaker box (as needed)
✔ Final connection by a licensed electrician
✓ UTILITIES PREP
4. Water Line
✔ ¾" – 1" water line run to pad
✔ Shutoff valve installed
✔ Pressure tested


✓ UTILITIES PREP
5. Sewer / Septic
Choose one:
​
✔ Tie-in to existing septic
✔ Connection to municipal sewer
✔ Separate pod-specific mini-septic system
​
Line must be accessible at pod.
✓ DELIVERY ACCESS
6. Confirm Delivery Route
✔ Road wide enough for long trailers
✔ Gate access open and clear
✔ No soft ground, mud, or steep inclines
✔ Low-hanging branches trimmed
✔ No locked gates on delivery day
✔ Space to turn around or back in


✓ LEGAL & PERMITTING
7. Check Local Requirements
✔ Notify county/city about modular placement
✔ Confirm if permit is required
✔ Confirm setback requirements
✔ HOA approval (if applicable)
​
Most counties in rural areas require minimal permitting.
✓ ON-SITE PREP
8. Prepare the Arrival Area
✔ Clear crew parking area
✔ Have property owner or rep onsite
✔ Mark utility lines
✔ Mark exact pod placement with flags or stakes
✔ Remove dogs, animals, or guests during delivery window


✓ POST-DELIVERY SETUP
9. Final Utility Connections
✔ Electric hooked up
✔ Water connected
✔ Sewer connected
✔ Pod leveled and anchored (if required)
✔ Skirting installed (optional)
​
*We can provide any or all services at additional costs
✓ POST-DELIVERY SETUP
10. Interior & Exterior Readiness
✔ Test HVAC
✔ Test all outlets & switches
✔ Run water to check lines
✔ Verify WiFi coverage
✔ Add pathway lighting if needed
✔ Prepare guest-ready touches


✓ FINAL APPROVAL
11. LuxeDwellingCo Walkthrough & Sign-Off
✔ Condition photos
✔ Anchor inspection
✔ Systems test
✔ Lease activation
✔ Pod officially “ready for guests”
OPTIONAL UPGRADES (STR-Ready)
✔ Hot tub
✔ Fire pit
✔ Outdoor seating
✔ Landscape lighting
✔ Gravel parking pad
✔ Privacy fencing/screens
✔ Deck or patio
✔ Welcome signage
✔ Smart lock + WiFi control
✔ Mini-split WiFi control
​
*We can provide any or all services at additional costs
(These boost ADR 15–40%.)